Best Time to Paint Your Home in Northern California: Seasonal Guide
Choosing the right time to paint your Northern California home is just as important as selecting quality paint and hiring experienced contractors. Paint needs specific temperature and humidity conditions to dry properly, cure completely, and deliver the durability you're paying for. Apply the best paint in the world during poor weather conditions, and you'll see premature failure. Apply mid-grade paint during ideal conditions, and it will outperform expectations.
Northern California's Mediterranean climate creates distinct seasons with different painting challenges. We don't experience the extreme cold, heat, or humidity of other U.S. regions, but we do face persistent summer fog near the coast, bone-dry fall heat inland, and unpredictable winter rain patterns that can stretch from November through April.
If you've tried to schedule a painting project only to hear contractors turn down work during certain months, or if you've wondered why some painters push to start immediately while others want to wait several weeks, this guide explains the seasonal realities of painting in the Bay Area.
At Lamorinda Painting, we've completed thousands of painting projects throughout Lafayette, Orinda, Moraga, Walnut Creek, and across the East Bay. We've learned which months offer ideal conditions, when to avoid exterior painting entirely, and how to identify the short weather windows where professional painting delivers the best results. Here's what you need to know about timing your Northern California painting project.
Understanding How Weather Affects Paint Performance
Temperature Requirements for Latex Paint
Most modern exterior paints are water-based (latex) formulas that require specific temperature ranges for proper application and curing:
Minimum application temperature: Standard latex paints require surface temperatures above 50°F during application and for several hours afterward. Some products specify 40°F minimums, but performance at the low end of the range isn't ideal. Cold temperatures slow the chemical curing process dramatically.
Optimal application range: Paint performs best when applied at temperatures between 60-85°F. Within this range, the paint flows smoothly, brushes or sprays easily, and dries at a rate that allows proper film formation without surface defects.
Maximum temperature concerns: When surface temperatures exceed 90-95°F (which can happen even when air temperature is 80°F if the surface is in direct sun), paint dries too quickly. This rapid drying prevents proper leveling, causes lap marks, and can lead to poor adhesion as solvents flash off before the paint bonds to the surface.
Surface vs. air temperature: Dark surfaces in direct sunlight can be 20-30°F hotter than the ambient air temperature. A 75°F afternoon with full sun exposure might mean surface temperatures of 100°F or more on dark siding, which is too hot for proper paint application.
Humidity and Moisture Considerations
Humidity affects how quickly water-based paint dries and cures:
High humidity delays drying: When relative humidity exceeds 70-80%, water evaporates slowly from latex paint. This extends drying time dramatically and keeps paint vulnerable to damage (bugs landing on it, dust settling, dew condensing on the surface) for hours longer than normal.
Morning dew and fog: Northern California's coastal fog and morning dew deposit moisture on surfaces overnight. Painting a surface that looks dry but is actually damp from morning fog leads to adhesion problems and a cloudy appearance (blushing) in the dried paint film.
Moisture content in substrate: Wood siding, stucco, and other porous surfaces must be dry before painting. Moisture meters should read below 15% for wood. If surfaces are damp from recent rain, morning fog, or sprinkler overspray, paint can trap moisture beneath the film, leading to peeling and blistering.
Rain timing: Most paints need at least 4-6 hours of dry time before light rain and 24 hours before heavy rain. Premium paints dry faster (some claim rain resistance in 2 hours), but waiting for complete cure (several days) before significant rain exposure is ideal.
Why Proper Curing Matters
Drying and curing are different processes:
Drying (1-4 hours): The paint surface becomes tack-free and appears dry. Water and solvents evaporate, allowing the paint to harden enough that it won't transfer to a finger touch.
Curing (7-30 days): Chemical cross-linking continues long after the surface feels dry. The paint film gradually hardens, gains full adhesion to the substrate, and develops complete moisture resistance and durability. Temperature and humidity during this curing period affect long-term performance.
Painting during cold or very humid weather extends curing time significantly. A paint that cures in 14 days at 70°F might take 30+ days at 50°F with high humidity. During this extended curing period, the paint remains vulnerable to damage from rain, frost, or physical contact.
Northern California's Four Painting Seasons
Spring (March-May): Variable but Often Excellent
Spring offers some of the best painting weather in Northern California, especially in late April and May:
March: Early spring is unpredictable. March can deliver beautiful 70-degree days perfect for painting, but it can also bring late-season storms with heavy rain. The risk of losing several days to weather makes March challenging for scheduling larger projects. Interior painting works well in March when exterior conditions are questionable.
April: By mid-to-late April, rain becomes less frequent and temperatures climb into the 60s and low 70s—ideal for painting. April mornings can be cool (40s-50s), so exterior painting typically starts late morning and continues through afternoon. This is one of the best months for exterior work in inland East Bay areas like Lafayette, Walnut Creek, and Concord.
May: This is prime painting season throughout Northern California. Rain is rare, temperatures are comfortable (65-75°F), humidity is moderate, and days are long enough for extended work hours. Both coastal and inland areas have excellent conditions. Demand for painters peaks in May, so schedule projects early if you want work completed this month.
Spring advantages: Moderate temperatures, long daylight hours, relatively low humidity in inland areas, minimal fog compared to summer, and reliable dry weather (especially late April and May).
Spring challenges: Early spring rain can delay projects, cool mornings may require waiting for surfaces to warm, and high demand means contractors' schedules fill quickly.
Summer (June-August): Great Inland, Challenging Coastal
Summer in Northern California is actually two different climates separated by only a few miles:
Coastal summer (Richmond, El Cerrito, Pinole, San Pablo): June through August brings persistent marine layer fog that often doesn't burn off until afternoon or may linger all day. Morning humidity stays high (70-90%), surfaces remain damp, and paint drying is slow. These are actually some of the most challenging months for painting near the Bay. Professional painters often avoid coastal summer projects or schedule them for afternoon-only work.
Inland summer (Lafayette, Orinda, Walnut Creek, Concord, Pleasant Hill): These areas experience warm, dry conditions ideal for painting. Morning fog occasionally pushes through gaps in the coastal hills (especially in Lafayette and Orinda via the Caldecott Tunnel), but it usually burns off by late morning. Afternoon temperatures are perfect for painting, though surfaces in direct sun can get too hot during heat waves.
Heat wave considerations: When temperatures exceed 95°F, work early morning or late afternoon to avoid the hottest hours. Painting in full sun on dark surfaces when it's 95°F+ leads to poor results as paint dries too quickly.
Summer advantages (inland): Reliable dry weather, low humidity, long daylight hours (7 AM - 8 PM during peak summer), and predictable conditions for scheduling.
Summer challenges: Coastal fog makes mornings difficult or impossible for painting near the water, extreme heat during heat waves forces schedule adjustments, and popular season means high contractor demand.
Fall (September-November): The Best Overall Season
Most professional painters consider early fall the absolute best time for exterior painting in Northern California:
September: This is arguably the best month of the year for painting. Coastal fog diminishes significantly, temperatures are ideal (70-80°F), humidity drops, and rain is virtually nonexistent. Both coastal and inland areas have excellent conditions. The only challenge is high demand—everyone wants fall painting, so book early.
October: Nearly as good as September. Weather remains stable with warm days, cool nights, and minimal rain (though late October can see the season's first storms). This is prime time for completing exterior projects before winter weather arrives. Interior painting is also pleasant as homes don't need heating or cooling.
November: Early November can offer good painting weather, but the risk of rain increases significantly by mid-month. Coastal areas see fog return as weather patterns shift toward winter. This is a transitional month—you might get lucky with two weeks of dry weather or lose the entire month to early rains.
Fall advantages: Best overall weather conditions, diminishing coastal fog, ideal temperatures, low humidity inland, and stable conditions for scheduling large projects.
Fall challenges: High contractor demand (book 4-6 weeks ahead for popular September-October slots), narrowing weather window as November approaches, and shorter daylight hours than summer.
Winter (December-February): Interior Focus, Limited Exterior
Winter in Northern California means rain, cool temperatures, and high humidity—all challenging for exterior painting:
December-February: Rain can occur on 40-50% of days during peak winter months. Even when it's not actively raining, surfaces remain damp from overnight moisture, humidity stays high, and temperatures often fall below the 50°F minimum for latex paint. Exterior painting is risky and often impossible during extended rainy periods.
Dry spells: Winter does bring occasional dry periods—sometimes a week or even two weeks without rain. Experienced contractors may take advantage of these windows for small exterior projects or touch-ups, but predicting weather accurately enough to schedule and complete a full exterior paint job is difficult.
Interior painting thrives: Winter is actually ideal for interior painting. Indoor temperatures are controlled, humidity is manageable with proper ventilation, and homeowners are already spending more time indoors, making it easier to accommodate furniture displacement and room-by-room scheduling.
Cabinet painting timing: Winter is perfect for kitchen cabinet painting. The extended drying and curing times don't matter as much indoors, and many families prefer having their kitchen disrupted during holidays when they're traveling or have flexible cooking arrangements.
Winter advantages (interior): Contractor availability is better as exterior demand drops, indoor painting conditions are consistent and controllable, and families are often home for holidays (making it easier to coordinate).
Winter challenges (exterior): Frequent rain, cool temperatures, high humidity, short daylight hours, damp surfaces that won't dry properly, and extended paint curing times.
Regional Timing Variations Across the East Bay
Coastal Cities: Richmond, El Cerrito, Hercules, Pinole
Timing considerations for homes near the San Francisco Bay:
Best months: September, October, and May are your prime windows. These months combine lower fog frequency with warm temperatures and dry weather.
Challenging months: June, July, and August bring persistent marine layer fog that makes morning painting impossible. December through March are too wet and humid.
Moderate months: April and November are transitional—you might get excellent conditions or face challenges. Weather monitoring becomes critical.
Fog timing: Even during good months, coastal areas experience morning fog. Professional painters in these areas often schedule afternoon-only work or plan to start late morning after fog burns off.
Transition Zone: Lafayette, Orinda, Moraga
The Lamorinda area sits between coastal and inland climates:
Best months: April through June and September through October offer the longest window of reliable painting weather. These months balance coastal fog (which affects mornings) with inland warmth (which dries surfaces by afternoon).
Summer considerations: Morning fog pushing through the Caldecott Tunnel or other gaps can delay start times even in July and August, but afternoons are usually excellent for painting.
Fall timing: September and October are nearly perfect—coastal fog diminishes, temperatures stay warm but not hot, and rain is rare.
Winter limitations: Same as coastal areas—too wet and unpredictable for exterior work from December through February.
Inland East Bay: Walnut Creek, Concord, Pleasant Hill, San Ramon
Farther from the Bay, inland areas have the longest painting season:
Best months: April through October all offer good to excellent conditions. The six-month window gives maximum scheduling flexibility.
Summer heat management: July and August can bring 95°F+ temperatures. Work early mornings (starting at 7 AM) and late afternoons, avoiding midday heat when surfaces get too hot.
Extended fall: Inland areas stay warmer later in fall, sometimes offering good painting weather through mid-November if rain holds off.
Winter challenges: Rain affects inland areas just as much as coastal zones. The main advantage inland is faster drying when you do get dry spells, as humidity is lower and temperatures slightly warmer than at the coast.
Interior Painting Timing Considerations
Year-Round Flexibility with Seasonal Nuances
Interior painting isn't as weather-dependent as exterior work, but timing still matters:
Heating season (winter): Homes with forced-air heating can become quite dry during winter, which is actually helpful for paint drying. However, opening windows for ventilation (important for managing paint fumes) means cold air and potential discomfort. Modern low-VOC paints minimize this concern.
Cooling season (summer): Air conditioning removes humidity and maintains consistent temperatures, creating ideal conditions for paint drying and curing. However, you'll want to avoid opening windows during painting, which means relying on AC for comfort.
Shoulder seasons (spring/fall): These months offer the best of both worlds—mild temperatures allow opening windows for ventilation without discomfort, and moderate humidity levels support proper paint drying.
Humidity management: Run dehumidifiers in rooms being painted if indoor humidity exceeds 70%. Coastal homes during foggy periods may need this support even for interior painting.
Project-Specific Timing
Different interior projects have optimal timing:
Whole-house interior painting: Plan for summer (when kids are out of school) or winter holidays when families can more easily relocate during the 5-10 day process. Spring and fall work well for retirees or couples without school-age children.
Kitchen cabinet painting: Schedule during periods when you can use alternative cooking arrangements for 4-7 days. Summer vacations or winter holidays often work best. Avoid major cooking holidays (Thanksgiving, Christmas Eve/Day) unless you have alternative kitchen access.
Single room updates: These smaller projects can happen anytime. Master bedroom painting might make sense during a weekend getaway. Guest room painting works during periods when you don't have visitors scheduled.
Move-in/move-out painting: Time these projects for the transition period between occupants—after the previous resident moves out but before new residents move in. This typically offers the best access and least disruption.
How to Choose Your Specific Painting Window
Check Historical Weather Patterns
Northern California weather follows generally predictable patterns:
Reliable dry months: May, June (inland), July (inland), August (inland), September, and October have historically low rainfall. September and October combine low rain probability with ideal temperatures.
Transitional months: April and November can go either way. Check 10-day forecasts and be prepared to delay if rain appears likely.
Rainy season: December through March averages 15-25 inches of rain (most of our annual total). Exterior painting during these months is unreliable at best.
Fog season: June through August brings coastal fog. If you're within 5-10 miles of the Bay, expect foggy mornings even during otherwise perfect weather.
Monitor Extended Forecasts
When planning a painting project:
Two-week outlook: Check weather forecasts two weeks before your scheduled start date. Look for extended dry periods (5-7 days minimum for a complete exterior paint job).
Temperature trends: Confirm that daytime highs will stay in the 60-80°F range and overnight lows won't drop below 45-50°F during the curing period.
Humidity forecasts: Coastal areas should check humidity predictions. If marine layer forecasts show persistent fog, consider rescheduling or planning afternoon-only work.
Rain probability: Even 30-40% rain probability is concerning when painting exteriors. Wait for periods showing less than 20% probability to minimize risk.
Work with Contractor Availability
Professional painters know the best months and book accordingly:
Peak season booking: In the East Bay, experienced contractors fill their September-October calendars by July or August. If you want fall painting, contact contractors in midsummer.
Shoulder season advantages: April-May and June (inland) often have better availability than the September-October peak. Weather is nearly as good, but demand is slightly lower.
Off-season opportunities: Some contractors will schedule weather-dependent projects during transitional months (November, late March, early April) with the understanding that rain may cause delays. You might get better pricing but less schedule certainty.
Winter interior bookings: Contractors focus on interior work during winter, so cabinet painting, whole-house interiors, and commercial interior projects have good availability December through February.
Common Timing Mistakes Homeowners Make
Waiting Until You See Paint Failure
The mistake: Many homeowners wait until paint is actively peeling, cracking, or showing obvious failure before scheduling a repaint. By this point, water may already be penetrating wood siding or stucco, causing structural damage beyond cosmetic paint failure.
The consequence: Rushed scheduling during suboptimal weather, more expensive repairs beyond just painting, and potential emergency work during winter (the worst time for exterior painting).
Better approach: Inspect your home's exterior every spring. When you notice early signs of aging (fading, minor cracking, areas where paint is wearing thin), start planning a repaint for the next ideal season. This gives you time to get estimates, schedule during optimal weather, and address minor repairs before they become major problems.
Booking Too Late for Prime Season
The mistake: Calling contractors in late August or early September hoping for immediate September-October painting.
The consequence: Quality contractors are already booked 4-8 weeks out during peak season. You'll either wait until late October/November (when weather becomes less reliable) or settle for whatever contractor has immediate availability (often a red flag about their quality or reliability).
Better approach: Contact contractors in June or July to book September-October slots. For April-May painting, reach out in February or March. Good contractors appreciate the lead time and you'll have better schedule options.
Ignoring Microclimate Factors
The mistake: Assuming your home's painting window matches generic "Northern California" advice without considering local microclimate—coastal fog, tree canopy shade, or neighborhood-specific wind patterns.
The consequence: Paint applied during conditions you thought were ideal (based on general timing advice) fails to cure properly because your specific location experienced persistent fog, shade-related moisture, or other microclimate challenges.
Better approach: Talk to contractors familiar with your specific area. A painter who works regularly in Richmond understands coastal fog timing. A contractor who focuses on Lafayette knows about morning fog through the Caldecott Tunnel and how to work around it.
Painting Right Before Winter
The mistake: Starting or completing an exterior paint job in late October or November, right before winter rains typically begin.
The consequence: Paint hasn't fully cured when the first heavy rains arrive, potentially causing adhesion problems, water marks, or early failure. If rain interrupts the project mid-job, you're left with a partially painted house for months.
Better approach: Plan exterior projects to be completed by mid-October at the latest. This gives paint several weeks to cure before typical winter weather arrives. If you miss this window, wait until April rather than rushing a late fall/early winter job.
Emergency Repairs and Off-Season Work
When You Can't Wait for Ideal Weather
Sometimes painting can't be scheduled for perfect conditions:
Water damage repairs: If siding damage is allowing water infiltration, you may need to paint during suboptimal weather to prevent further damage. Professional painters can manage small projects during brief winter dry spells using fast-dry formulas and careful weather monitoring.
Pre-sale painting: If you're selling your home and need exterior painting completed to maximize market value, timing is dictated by real estate schedules rather than ideal weather. Work with contractors who can move quickly during weather windows and understand the urgency.
HOA deadlines: Some homeowners associations impose repair deadlines that don't align with optimal painting seasons. Document weather challenges if you're working under HOA pressure and communicate with the association about realistic completion timeframes.
Safety hazards: Peeling lead paint or damaged surfaces posing safety risks may require immediate attention regardless of season.
Cold-Weather and Fast-Dry Products
Some paints are formulated for challenging conditions:
Low-temperature formulas: Certain products (Sherwin-Williams Duration, Benjamin Moore Regal Select) claim application down to 35-40°F. These extend the possible painting season but don't make winter painting ideal—just possible when necessary.
Fast-dry technology: Some paints dry to the touch in 30-60 minutes and become rain-resistant in 2-3 hours. These formulations help during transitional weather but still cure better in optimal conditions.
When to use them: Reserve special-condition products for emergency repairs, small projects, or situations where waiting for better weather isn't possible. For planned whole-house repaints, wait for proper conditions and use standard premium products designed for maximum longevity.
Interior Painting: Optimal Timing Throughout the Year
Best Seasons for Interior Projects
While interior painting works year-round, certain times offer advantages:
Spring (March-May): Pleasant temperatures make it comfortable to open windows for ventilation. Moderate humidity supports proper paint drying without being so high it slows curing.
Summer (June-August): Long days allow extended work hours if needed. Air conditioning controls indoor environment perfectly. Dry conditions (inland) are ideal for paint curing. Kids being out of school makes major disruption (whole-house interiors) easier to manage.
Fall (September-November): Similar to spring—comfortable temperatures, good ventilation opportunities, moderate humidity. Many families find this timing works well before holiday hosting.
Winter (December-February): Actually excellent for interior work despite being poor for exteriors. Indoor temperatures are controlled, contractor availability is good, and low outdoor humidity (when it's not raining) means less moisture in the air. Holiday breaks make it easier to schedule around family activities.
Cabinet Painting Timing
Kitchen and bathroom cabinet painting has specific considerations:
Holiday periods: Thanksgiving through New Year's, or summer vacations, allow families to manage without full kitchen access for 5-7 days during the refinishing process.
Post-holiday (January-February): After holiday cooking and entertaining ends, many homeowners schedule January-February cabinet painting. Contractors have good availability during this period.
Avoid major events: Don't schedule cabinet painting the week before hosting Thanksgiving dinner, a graduation party, or other events requiring full kitchen access.
Plan alternative cooking: Line up microwave meals, use slow cookers, grill outdoors, or arrange to eat out during the painting period. Cabinet painting doesn't mean you can't access the kitchen, but you won't have normal cooking access for nearly a week.
Working with Professional Painters: Scheduling Best Practices
Lead Time for Quality Contractors
Professional painting contractors need adequate scheduling time:
Peak season (September-October): Contact contractors 6-8 weeks before your desired start date. Quality painters book these premium months early.
Good season (April-May, June-August inland): Allow 3-5 weeks lead time. Demand is high but not quite as competitive as fall.
Off-season (November-March for exteriors): You may find contractors with 1-2 week availability, but weather determines whether projects can actually proceed. For interior work during these months, 2-3 weeks lead time is typical.
Emergency or rush work: Some contractors maintain schedule flexibility for urgent repairs or time-sensitive projects, but expect to pay premium rates for quick turnaround.
Weather Delays and Rescheduling
Understand how weather affects professional painting schedules:
Built-in buffers: Experienced contractors build buffer time into schedules during transitional months, knowing that weather may cause 1-2 day delays. Don't be concerned if your project timeline includes "weather days."
Communication about delays: Professional painters monitor forecasts and should communicate proactively if weather will prevent starting on schedule or cause mid-project delays.
Payment timing: Most contracts specify that final payment is due upon completion, not on a specific calendar date. Weather delays shouldn't trigger final payment until work is actually complete.
Flexibility expectations: If you schedule painting during April or November (transitional months), expect the possibility of weather delays. If you need guaranteed completion by a specific date, schedule during more reliable months (May, September, October).
Frequently Asked Questions
What's the single best month to paint a house in Northern California?
September is consistently the best month across both coastal and inland areas. Weather is reliable, coastal fog diminishes, temperatures are ideal (70-80°F), and rain probability is very low. October is nearly as good. If you can only choose one month for exterior painting, choose September.
Can you paint a house exterior in winter in Northern California?
It's possible during dry spells but not recommended for whole-house projects. Winter brings frequent rain, cool temperatures (often below the 50°F minimum for latex paint), high humidity, and short daylight hours. Small repairs or touch-ups during brief dry periods are manageable, but plan major exterior painting for spring through fall.
How much lead time do I need to book a painting contractor during peak season?
For September-October painting (peak season in Northern California), contact contractors 6-8 weeks in advance—ideally by July or early August. Quality contractors fill their fall schedules early. For other good months (April, May, June), 3-5 weeks lead time is typically sufficient.
Is summer fog really that big a problem for painting?
Near the coast, yes. June through August brings persistent marine layer fog to cities like Richmond, El Cerrito, Pinole, and Hercules. Fog keeps surfaces damp, raises humidity to 70-90%, and prevents proper paint drying. Coastal painting during fog season often means waiting until afternoon to start work, which limits productive hours. Inland areas (Lafayette, Walnut Creek, Concord) handle summer much better.
What happens if it rains right after my house is painted?
If paint has been dry for 4-6 hours before light rain, it's usually fine (though not ideal). If heavy rain occurs before paint is dry, you'll likely see water marks, uneven appearance, or adhesion problems. Most premium paints claim rain resistance in 2-3 hours, but 24 hours is much safer. This is why painting during reliably dry months (May, September, October) matters so much.
Can I paint my home's interior any time of year?
Yes. Interior painting isn't as weather-dependent as exterior work since indoor temperatures and humidity are controlled. That said, spring and fall offer the most comfortable conditions for opening windows for ventilation. Winter is actually excellent for interior work—contractors have better availability and heating keeps indoor air dry.
How far in advance can I schedule a painting project?
Most contractors book 2-3 months in advance at most. A few may take bookings 4-6 months out for major projects, but this is uncommon. For typical exterior house painting, contact contractors about 6-8 weeks before your desired month for best availability.
What if I need painting done immediately and it's the wrong season?
Small projects and repairs can sometimes be squeezed into brief weather windows even during challenging months. Talk to contractors about your timeline and why it's urgent. Be prepared to pay premium rates for rush work and understand that weather may still cause delays. For true emergencies (water damage, safety hazards), contractors can often find solutions using fast-dry products and careful scheduling.
Professional Painting Services Year-Round in the East Bay
At Lamorinda Painting, we serve homeowners throughout Lafayette, Orinda, Moraga, Walnut Creek, and the greater East Bay with high-quality painting services at affordable prices. We understand Northern California's seasonal weather patterns and how to schedule projects for optimal results.
Whether you're planning exterior painting during our prime September-October window or need interior cabinet refinishing during winter months, we provide expert guidance on timing, detailed preparation, and professional execution that delivers lasting results.
We're fully licensed and insured, and our attention to detail sets us apart. We always leave your home spotless when the job is done, and your satisfaction is our top priority.
Contact us today for a free estimate on your painting project. We'll help you identify the best timing for your specific home and location, explain how weather affects your project, and schedule work during optimal conditions for maximum paint performance and longevity.
Schema Markup:
- Article: LocalBusiness article about painting timing and seasons
- FAQPage: All FAQ questions with answers
- Service: Painting services throughout Northern California
- AggregateRating: (5.0 stars, 200+ reviews)
Internal Links:
Related Articles & Services
Need Professional Painting Services?
Lamorinda Painting has been serving the Bay Area since 2003 with high-quality painting services at affordable prices. Contact us for a free estimate.
Get Your Free EstimateCall us today: (925) 890-0361